asapm Home
IPMA Home (external link)
navigation map Young Crew Home (external site) Media & Magazine Home Membership and Member Services Home Education & Learning Home Standards Home Certification Home

Work Breakdown Structure Example


Sample Systems Development Life Cycle and WBS Phases and Products

Phases

Planning






Requirements Definition




External Design





Internal Design











Development













Test









Implementation


Maintenance

Products (Code)

System Change Request (F)
Feasibility Study (F)
Project Work Plan (I)
Cost/Benefit Analysis (F)
Risk Assessment (F)
Acquisition Plan (I)

Functional Requirements Document (I)
Test Plan (I)
Project Work Plan (U)
Acquisition Plan (U)

Test Plan (U)
External Design Document (I)
Functional Requirements (U)
Project Work Plan (F)
Acquistion Plan (U)

Test Plan (U)
Implementation Plan (I)
Internal Design Document (I)
External Design Document (U)
Functional Requirements Document (F)
Operators Manual (I)
Users Guide (I)
Maintenance Manual
Acquistion Plan (U)
Conversion Plan (I)
Training Plan (I)

Program Modules (I)
Software Development Folders (I)
Internal Design Document (F)
Test Analysis Report (F)
External Design Document (U)
Operators Manual (U)
Users Guide (U)
Maintenance Manual (U)
Conversion Plan (U)
Implementation Plan (U)
Acquisition Plan (U)
Training Plan (U)
Test Files (F)

Test Analysis Report (F)
Program Modules (F)
Maintenance Manual (F)
User Guide (F)
Operators Manual (F)
Training Plan (F)
Implementation Plan (F)
Conversion
Acquisition Plan (F)

Delivered System (F)
Production Database

Software Development Folder (F)
System Change Requests (F)
Problem Reports
User Satisfaction Survey (F)

Key to Codes:

I-initial
U-update
F-final

• Top •

To return to the Book Review contents page, click here.


About Us page Information about Joining asapm Search asapm, IPMA and the Competence Enabler sites asapm Members Only site; login required

©2012 asapm